Post-Construction CleaningThree phases to move-in
We know what the day after looks like. We clean in three phases, right through to the final clean — until the space is ready for the owner to move in.
Three phases, one result
After construction or renovation, we work to a proven three-phase cleaning system — until the space is ready for the owner to move in. We handle new builds and renovated spaces.
We come to you, across the Bay
A new build or a renovated space in Luštica Bay, Porto Montenegro, Tivat or anywhere on the coast — from Herceg Novi to Budva.
Three precise phases
Rough Phase
Removal of coarse construction material and vacuuming. Before moving to the detailed phase, we let the space "settle" — typically 12 to 24 hours — so remaining fine dust in the air comes to rest on surfaces instead of being stirred back up during the final pass.
Detailed Cleaning
Removing protective film from fittings and hardware, dust removal, stubborn stains from floor and wall surfaces, machine washing of the entire property.
Final Phase
Detailed finishing of the entire property before handover to the owners, with a final inspection across more than 80 checkpoints.
What you should know
How long does post-construction cleaning take?
It depends on how dirty the property is and its size. We take on properties up to a maximum of 300 m², for the best possible result and quality.
Are the products too strong for sensitive materials?
No — we use only products specifically suited to the material being treated, in controlled doses, so the risk of damage is kept to a minimum.
What if I notice something isn't right afterwards?
We remain available to resolve any oversight. After the third phase, we run a detailed inspection across more than 80 checkpoints, which keeps the chance of a complaint to a minimum.
You Might Also Like
See the price for your space
Open the calculator for an estimate.
Or send a few photos of the space on WhatsApp.